Categories
Contact Us

Cixi Xianghe Communication Equipment Co.,Ltd

Add:Dongfan Industrial Zone, Henghe Town, Cixi, Ningbo City, Zhejiang Province, China

Tel:86-0574-63191191

Mobile:86-15957487368

Fax:86-0574-63191191

Email:sales@xianghetx.com

Knowledge
Home > Knowledge > Content
Waterproof, shock, impact
Feb 07, 2018

The optical fiber splice box, also called the optical fiber splice box and the barrel, is where the ends of the optical fiber cables are plugged in. Then optical fiber jumpers are used to connect the optical switches to prevent the materials from aging caused by heat, cold, light, oxygen and microorganisms in nature, And has excellent mechanical strength. The sturdy cable splice case shell and main structure can withstand the harshest environmental changes, and at the same time, it can play a role of fire-retardant and water-proof, and can protect the shock, impact, optical cable from stretching and twisting.

1, support frame: is the main body of the internal components.

2, optical cable fixing device: used for fixing optical cable and base and reinforcing component of optical cable. First, the cable core to strengthen the internal fixed; Second, the cable and the support frame clamping fixed; Third, cable and connector box into and out of the cable with thermal jacket seal fixed. [1] 

3, Optical fiber placement device: The optical fiber connector and the remaining optical fiber can be stored in sequence. The length of the remaining optical fiber should not be less than 1m. The remaining optical fiber winding diameter is not less than 35mm. Including storage capacity of more than four layers, larger capacity, and according to the number of cores to adjust the optical fiber cable tray.

4, optical fiber connector protection: The heat-shrinkable protective tube on the holder of the core holder can also be used on the silica gel fixed method.

5, cable and connector box seal: The cable and the base into the cable with emery cloth connector box and optical cable at the junction of polishing, polished with abrasive cleaning Department, affixed aluminum foil, and then shrink tube on the connector box Into the cable office, with the torch in accordance with the first after the middle of the slow heating at both ends, so that the entire shrink tube can be fully contracted.


  • Newsletter
  • Categories
  • Contact Us

    Cixi Xianghe Communication Equipment Co.,Ltd

    Add:Dongfan Industrial Zone, Henghe Town, Cixi, Ningbo City, Zhejiang Province, China

    Tel:86-0574-63191191

    Mobile:86-15957487368

    Fax:86-0574-63191191

    Email:sales@xianghetx.com

  • QR Code
  • Copyright © Cixi Xianghe Communication Equipment Co.,Ltd All Rights Reserved.